Re: part p
Reply #17 - Sep 24th, 2004, 9:41pm
 
This is in response to John Davies post in particular.

I am going to stick my neck out here  Lips Sealed

I have in front of me the actual approved document on Part P of the building regs so I believe I am equipped to answer the query better than most "off-the-cuff" heard this read that type comments that fill the forum!

If you want to build your own extension you have to work to the building regs right? So are you a builder? Are you notifying the building control of your building?
Point here is this. I cannot see anything in the ACTUAL APPROVED DOCUMENT that says you have to be a fully qualified or fully certified electrician to carry out this kind of work.  If you know what you are doing and you get your work tested and inspected by a qualified electrician AND you notify the building control of your works in accordance with building regs then I see no problem with your plans to do it yourself.  All you would do is add another inspection requirement to your list of things to do and ensure you get your work inspected and tested to BS7671 in order to comply with Part P. Dont listen to all the crap that is being banded about by people who have never bothered reading the stuff and just go by what they hear etc. Take it from me mate just go ahead and do it.

First step. If you carry out your building work AFTER 1 Jan 2005 then part P will be in force. Notify building control inspector that you are carrying out electrical work (just as you would notify them of the building work) and send appropriate fee. (This I expect will be available from each of the LA's at the appropriate time).
Second step. Get an electrician lined up to test and inspect your work.
Step 3. Install your wiring as the building work progresses in the usual manner.
Step 4. Act on any comments issued to you (if any) from the building inspector.
Step 5. Get the BS7671 Test and inspection certificate.
Thats it!

That will IMHO comply fully with Part P and so long as building control okay it then you are home and dry. You wont be breaking the law, you wont need to be part of any schemes and you wont be infringing the building regs.

Let the comments begin....

Roy  Roll Eyes
Back to top
« Last Edit: Sep 24th, 2004, 9:43pm by unphased »  
 
IP Logged
 
The_Trician
Trade Member
*****
Offline


Posts: 7721


Total Thanks: 8
For This Post: 0


Gender: male

Trade: Electrician



Re: part p
Reply #18 - Sep 24th, 2004, 10:54pm
 
Hi Roy,
I'll be the first to hold my hand up and admit that I have not FULLY read the ODPM document, but from those who are punting the schemes the emphasis is on the fact that if, for example, you are adding an extra circuit, and you are not a registered/approved/self certifier, the you ARE, or WILL BE breaking the law post Jan 05.

Now, is this correct or incorrect?
There's a subtle difference between doing it and getting it approved after the event, but if say, you are a builder who has NOT applied for permission PRIOR to commencing the work, then Local Councils have been known to get a court order to have the building pulled down at your expense, irrespective as to whether or not the building work meets all the criteria.

Now, say you totally rewire your house and don't notify Building Control. They have a right to get you to have it all ripped out, irrespective of whether or not it meets BS7671 et al. The very fact that you didn't notify them would give them adequate grounds. They may even point out that even if you do tell them, but you yourself ARE NOT an approved self-certifier, then the same could happen - yes?

TT
Back to top
 

Thats the trouble with a colostomy - you can never find the shoes to match the bag.......
Thank User For This Post  
IP Logged
 
fubar
Junior Member
**
Offline


Posts: 10


Total Thanks: 0
For This Post: 0


Gender: male

Re: part p
Reply #19 - Sep 25th, 2004, 1:05am
 
Unphased,

You are mostly correct with your steps, however
a) building control will inspect the work (probably by asking their local NAPIT or NICEIC member to inspect on their behalf).
b) you have to give the appropriate notice at each stage.  ISTR it is 48 hours notice before stage 1 and 24 hours notice for the inspections.
c) you have to invite building control to inspect the work once before it is covered up and again just before the installation is put into service.


[quote author=The_Trician  link=1095702771/15#18 date=1096062889]
Hi Roy,
I'll be the first to hold my hand up and admit that I have not FULLY read the ODPM document, but from those who are punting the schemes the emphasis is on the fact that if, for example, you are adding an extra circuit, and you are not a registered/approved/self certifier, the you ARE, or WILL BE breaking the law post Jan 05.

Now, is this correct or incorrect?
[/quote]

Yes, all the scheme provides really are misleading us.  The part of the approved document that is relevant here is section 0.7 and 0.8.  Either the building control must be notified as unphased outlined (section 0.7) OR the person is registered with an approved scheme (section 0.8a), OR the work is non-notifiable (section 0.8b)

Quote:
Now, say you totally rewire your house and don't notify Building Control. They have a right to get you to have it all ripped out, irrespective of whether or not it meets BS7671 et al. The very fact that you didn't notify them would give them adequate grounds.


Correct

Quote:
They may even point out that even if you do tell them, but you yourself ARE NOT an approved self-certifier, then the same could happen - yes?


No, see above.
Back to top
« Last Edit: Sep 25th, 2004, 1:08am by fubar »  

Michael&&
Thank User For This Post  
IP Logged
 
The_Trician
Trade Member
*****
Offline


Posts: 7721


Total Thanks: 8
For This Post: 0


Gender: male

Trade: Electrician



Re: part p
Reply #20 - Sep 25th, 2004, 10:29am
 
There is of course, the thorny issue of retrospective consent too....

TT
Back to top
 

Thats the trouble with a colostomy - you can never find the shoes to match the bag.......
Thank User For This Post  
IP Logged
 
The_Trician
Trade Member
*****
Offline


Posts: 7721


Total Thanks: 8
For This Post: 0


Gender: male

Trade: Electrician



Re: part p
Reply #21 - Sep 25th, 2004, 10:35am
 
How about the scenario where a non-registered spark carries out a complete rewire for example, and tells the client that the only time they'll need a cert is when they sell the property, which could be years on in the future.

Come selling time, all the client has to do is get a PIR done on the property to complete the supposedly forthcoming 'House-seller's pack'. and Building Control are non the wiser. The trick is to make sure the installation fully complies when its done, leaving just a PIR and no remedial work. All 3 parties 'win'.

Seller has a cert to say all is well, non-registered sparks has earnt a few bob, and the registered sparks gets a cut for the PIR. Everyone's happy and Building Control have had an extra burden taken off their shoulders.

And best of all -Tony Bliar's mob have been left out in the cold!

Job sorted!

TT
Back to top
 

Thats the trouble with a colostomy - you can never find the shoes to match the bag.......
Thank User For This Post  
IP Logged
 
unphased
Re: part p
Reply #22 - Sep 25th, 2004, 11:32am
 
Hiya TT and fubar

Point I am trying to bring out about the Part P hype is that all emphasis appears to be focused (wrongly and misleadingly) on the self certification schemes and the criminal aspect of non-compliance.

There is already a myth quite firmly planted in the majority of sparks minds that DIY work will no longer be possible. If a DIY'er is competent enough to wire a house or a circuit or make alterations and extensions then, provided he goes about it in the correct way by notifying building control and paying the fee and getting it inspected and passed there is no reason why a DIY'er cannot comply.  As fubar points out if the work is found to be unacceptable by the building inspector it will simply not be passed. It doesn't mean that the DIY'er will be branded a criminal and all the rest of it.  The work would simply have to be brought up to a standard that building control will accept.

There is a section in Part P (0.8 b ii) which highlights my point in relation to non-notifiable work and which I reproduce here in full:

"When the non-notifiable work described in Table 1 is to be undertaken by a DIY worker, a way of showing compliance would be to follow the IEE guidance or guidance in other authoritative manuals that are based on this, and to have a competent person inspect and test the work and supply a Minor Electrical Installation Works Certificate. The competent person need not necessarily be registered with an electrical self-certification scheme but, as required by BS 7671, must be competent in respect of the inspection and testing of an installation."

I recommend that you download Part P, TT, from the ODPM website. It doesn't take long and you will be pleasantly surprised by the content!  Smiley

Roy
Back to top
« Last Edit: Sep 25th, 2004, 11:33am by unphased »  
Thank User For This Post  
IP Logged
 
fubar
Junior Member
**
Offline


Posts: 10


Total Thanks: 0
For This Post: 0


Gender: male

Re: part p
Reply #23 - Sep 25th, 2004, 11:35am
 
[quote author=The_Trician  link=1095702771/15#21 date=1096104937]How about the scenario where a non-registered spark carries out a complete rewire for example, and tells the client that the only time they'll need a cert is when they sell the property, which could be years on in the future.
[/quote]

I'm sure there are lots of ways for the cowboys to evade Part P, Trician, just like there are ways for them evade VAT.  It will be interesting to see what happens with the proposed warranty schemes.

I would expect to see text that says that the warranty is only valid when an electrical installation or minor works certificate has been issued.  So customers will get to choose between a cowboy without a warranty and a professional tradesperson with a warranty (and probably higher prices).

What I really can't understand is why none of the other schemes have undercut NICEICs prices.
Back to top
« Last Edit: Sep 25th, 2004, 11:36am by fubar »  

Michael&&
Thank User For This Post  
IP Logged
 
LSpark
Global Moderator
Trade Member
Author
*****
Offline


Posts: 8069


Total Thanks: 3
For This Post: 0


London, UK, United Kingdom
London, UK
United Kingdom

Gender: male

Trade: Electrician



Re: part p
Reply #24 - Sep 25th, 2004, 3:42pm
 
Quote:
There is already a myth quite firmly planted in the majority of sparks minds that DIY work will no longer be possible. If a DIY'er is competent enough to wire a house or a circuit or make alterations and extensions then, provided he goes about it in the correct way by notifying building control and paying the fee and getting it inspected and passed there is no reason why a DIY'er cannot comply.  As fubar points out if the work is found to be unacceptable by the building inspector it will simply not be passed. It doesn't mean that the DIY'er will be branded a criminal and all the rest of it.  The work would simply have to be brought up to a standard that building control will accept.  


Very much so UP, I have to admit I have noy had time to get hold of the aproved part p yet, what I have is all pre-aproved stuff which was in debate.

Im not going to stick my neck out on this without reading the report, but unless someone is very confident, I wouldnt advise them to do this work anyway.

However it may or may not be the case that the work can be carried out by say a DIY'r, At the moment (Pre January 05) it can be and this would be the time to commence work!, after January if its ok for competent persons to do the work e.g. confident DIY'r - with aproval and proper notification to LABC, then I can't see where there would be any problem
Back to top
« Last Edit: Sep 25th, 2004, 4:11pm by LSpark »  
Thank User For This Post View members image gallery  
IP Logged
 
ChubbyPhaseWire
Re: part p
Reply #25 - Sep 25th, 2004, 3:52pm
 
(edited)



'New law spells end to DIY electrics and cowboy electricians'


CLANG
LMFAO
Back to top
« Last Edit: Sep 25th, 2004, 4:33pm by LSpark »  
Thank User For This Post  
IP Logged
 
LSpark
Global Moderator
Trade Member
Author
*****
Offline


Posts: 8069


Total Thanks: 3
For This Post: 0


London, UK, United Kingdom
London, UK
United Kingdom

Gender: male

Trade: Electrician



Re: part p
Reply #26 - Sep 25th, 2004, 4:15pm
 
You missed out the laughing emoticon, I shouldnt have to dumb it all down just for you  Wink

p.s. dont associate my name with something I didnt say = thx  8)
Back to top
« Last Edit: Sep 25th, 2004, 4:33pm by LSpark »  
Thank User For This Post View members image gallery  
IP Logged
 
fubar
Junior Member
**
Offline


Posts: 10


Total Thanks: 0
For This Post: 0


Gender: male

Re: part p
Reply #27 - Sep 25th, 2004, 5:06pm
 
[quote author=unphased  link=1095702771/15#22 date=1096108349]
It doesn't mean that the DIY'er will be branded a criminal and all the rest of it.  The work would simply have to be brought up to a standard that building control will accept.
[/quote]

To clarify, while in this scenario (notifying building control properly, but then performing sub-standard work), building control will likely give you every opportunity to bring the work up to scratch, two things should be noted:

a)  telling building control but not filling in their forms and/or not paying the fee is considered as failure to notify.

b)  There are serious financial penalties for failure to notify building control, including a £5000 fine for each occurence (complete failure to notify building control would be considered three offences, so, that is £15000 for each "job"). There are ongoing fines, too.  If I understand it correctly, the offence is known by the snappy title "An offence under the Building Act 1984 (as ammended)".  

While the requirement to notify building control for electrical work is new, the actual building control notification process remains the same - it will simply apply to include electrical work as well as windows, doors, RSJs, etc - so you can read about the generic rules and fines on your local building control website right now.
Back to top
« Last Edit: Sep 25th, 2004, 5:14pm by fubar »  

Michael&&
Thank User For This Post  
IP Logged
 
Beanzy
Re: part p
Reply #28 - Sep 25th, 2004, 9:42pm
 
The Part P schemes only offer a way around the cost and faff of the notification process. The preliminary notification around here costs £70 and the completion one and inspection can be £120-260 depending on the scale of the work..... not good. Really it's a way of introducing the new regs without stuffing a huge bill on people who do it day in day out. For something like an extension or a re-wire the thing doesn't really factor in as there'll be Regs notifications and inspections going on anyway so PartP will get lumped into that anyway.

The only thing you can get from the NICEIC reg'd spark is a PIR which won't prove compliance with the buildings regs. NAPIT bods can inspect others work and certify it so they may be a better route for the go it alone approach, but you'll have to have them come by a few times during the work so they can inspect cable routings and erection methods.

Back to top
 
Thank User For This Post  
IP Logged
 
trowelhead
Re: part p
Reply #29 - Sep 25th, 2004, 9:56pm
 
Am i reading ths right:- As long as the BCO is informed for certain electrical works (and the obligitory fee paid Angry) then this will comply with part p.
Question:- How does the inspector know?Is he/she a qualified person?Or am i totally missing the point here? Undecided
Back to top
 
Thank User For This Post  
IP Logged
 
tellondon
Re: part p
Reply #30 - Sep 25th, 2004, 10:23pm
 
As long as the work is done to the BS 7671 standard with full inspection and test then yes anyone can do it

Im not sure if BC will test it themselves, they will have to recruit alot of electrical engineers between now and the new year if they are, my GUESS is that they might get registered NICEIC approved companys to do it for them
Back to top
 
Thank User For This Post  
IP Logged
 
fubar
Junior Member
**
Offline


Posts: 10


Total Thanks: 0
For This Post: 0


Gender: male

Re: part p
Reply #31 - Sep 25th, 2004, 10:33pm
 
[quote author=trowelhead  link=1095702771/15#29 date=1096145816]Am i reading ths right:- As long as the BCO is informed for certain electrical works (and the obligitory fee paid Angry) then this will comply with part p.
[/quote]

Yes, as long as you notify them as described earlier in this thread and as long as you are able to show that you have met the requirements of Part P (essentially, to adhere to BS7671), including suitable inspection and testing prior to being put into service.

Quote:
Question:- How does the inspector know?Is he/she a qualified person?Or am i totally missing the point here? Undecided


The funny thing is that building control don't yet know how they will be running their side of this scheme.  A minority of offices will have officers right now who are competent to inspect electrical work.  It is assumed that most, if not all, will farm out the inspection work to NICEIC or NAPIT members, at least until they are able to build their in-house competency.
Back to top
« Last Edit: Sep 25th, 2004, 10:39pm by fubar »  

Michael&&
Thank User For This Post  
IP Logged
 
The_Trician
Trade Member
*****
Offline


Posts: 7721


Total Thanks: 8
For This Post: 0


Gender: male

Trade: Electrician



Re: part p
Reply #32 - Sep 26th, 2004, 1:16am
 
Personally, I cannot vere see the day when LABC offices in all areas of the country will ever be in a position financially to employ their own electrical inspectors.

The Local Authorities are unpopular enough as it is already, what with year-on-year Council Tax rises.

There presently no extra monies coming from Central Govt to fund Part P and the extra resources required to enforce it effectively, nor do I believe that there ever will be.

I reckon it'll all be farmed out via CCT to 'Approved Contractors.

TT
Back to top
 

Thats the trouble with a colostomy - you can never find the shoes to match the bag.......