A 3ph Problem
Mar 1st, 2015, 8:20pm
 
OK here is the situation. The premises - A Hairdresser shop.

3P supply to shop. Split L1 - Dist board for Shop, L2 - Dist Board for Annex (Supplied by 3 core 10mm SWA), L3 - Sunbed room next to annex (1P 63A) (Supplied by 3-core 10mm SWA).

The owner requires a second sunbed and the fitting co need 3P supply in Annex and wish the original sunbed converted back to 3P. Both beds to supplied with 25A type C MCB and 63A RCD. That's the easy bit.

Question - Instead of laying a new 5core cable is there anything wrong with using the existing two 3 Core to provide the 3P supply. Assuming the calcs where correct and everything was correctly labelled.  A bit unorthodox but does it comply?  All comments suggestions welcome.

And welcome back
Back to top
 
 
IP Logged
 
Lectrician
Administrator
Trade Member
Author
*****
Offline

Ask The Trades
Posts: 8814


Total Thanks: 109
For This Post: 1


Braunton, North Devon, United Kingdom
Braunton, North Devon
United Kingdom

Gender: male

Trade: Electrician



Re: A 3ph Problem
Reply #1 - Mar 1st, 2015, 8:35pm
 
If you mean use the three core as 3phases and no neutral (if the beds don't require one), then yes.

However, I would say a neutral would be required.

If so, all lives and neutral need to be contained in the same armoured cable as the armour is magnetic.  You cannot put the phases down one cable and the neutral down another.
Back to top
 

Need to post a picture? Click HERE for info!
Thank User For This Post WWW View members image gallery  
IP Logged
 
get_it_done
Re: A 3ph Problem
Reply #2 - Mar 1st, 2015, 9:35pm
 
I knew it would not be that easy.  Yup a neutral is required.
I did look up the big green book and Reg 521.5.1 explains it all.

Back to plan A
Back to top
 
Thank User For This Post  
IP Logged
 
get_it_done
Re: A 3ph Problem
Reply #3 - Mar 2nd, 2015, 1:04pm
 
Is there any sparky available in the Slough area to do a bit of 3p work ASAP?