TrevorP
|
Am in the process of upgrading a shower and have removed the pipe to shower valve, as these were not the standard 150mm apart, as most new types are. But while doing this a very large piece of the wall render came away with them. This render was in sand/cement and about 12mm thick, with a plaster skim coat. I have fitted the new pipes in the thermolite wall, but am unsure what to do with the wall, should I: 1) re-render in sand/cement? 2)use Bonding or Browning plaster 3)cut out and fit plasterboard? if so how do I fit this, baring in mind its in a shower. As this is for one of the kids there is not much money left to get a plaster in, so helpful advise urgently needed please. Cheers Trevor
|