Jul 7th, 2004, 11:05am
 
I need to install a new 4 way sub board for a 6KW electric heating system in my flat, the board will consist of 1 x 32 amp mcb- bolier 1 x 16amp mcb- imersion 1 x 5amp- clock, complete system running at 45-50 amps. Im going to install a 10mm T+E supply cable, Is this big enough. And can wire the supply cable direct off of the henly block at mains or should i wire it from consummer unit with a 45 amp mcb for protection. Do i need to install an isolator inbetween the mains and sub DB. Also do you think theres a chance of over loading the mains by doing this ,considering that i have an 80 amp supply to the flat, with 1 x 32 amp cooker, 1 x ring -kitchen 1x 32amp- ring main 1 x 5 amp-lighting. Any adice would be appreciated!
Back to top
 
Thank User For This Post  
IP Logged
 
plugwash
Administrator
*****
Offline

I love YaBB 1G - SP1!

Posts: 1383


Total Thanks: 0
For This Post: 0



Trade: Not Specified

Re: DB
Reply #1 - Jul 7th, 2004, 3:22pm
 
45A seems a bit on the light side

i would use a 50A mcb in the existing CU with 16mm twin and earth

Back to top
 
Thank User For This Post WWW plugwash plugwash 107767391 peter_m_green_zyworld_com plugwash  
IP Logged
 
jaja
Junior Member
**
Offline

I love YaBB 1G - SP1!

Posts: 6


Total Thanks: 0
For This Post: 0



Re: DB
Reply #2 - Jul 7th, 2004, 4:01pm
 
The reason i chose a 45 amp mcb is because The existing CU is an old wylex rewirable, and i think the max MCB i can get for it is 45 amp (mini trip) without replacing the CU . So you dont think that a 10mm isn't sufficient enough to handle the load?

And coming straight off of the henly block and into an islolator and then into the Sub DB is out of the question?
Back to top
 
Thank User For This Post  
IP Logged
 
plugwash
Administrator
*****
Offline

I love YaBB 1G - SP1!

Posts: 1383


Total Thanks: 0
For This Post: 0



Trade: Not Specified

Re: DB
Reply #3 - Jul 7th, 2004, 4:46pm
 
10mm on 45A sounds ok it dpends on exactly how much each appliance draws

also if your wylex board only has a 63A main switch then you  should not fit any breakers above 32A

you can henly into the tails and i will post the procedure below but the new board should be close to the henlys and should be wired in with 25mm tails

Back to top
 
Thank User For This Post WWW plugwash plugwash 107767391 peter_m_green_zyworld_com plugwash  
IP Logged
 
plugwash
Administrator
*****
Offline

I love YaBB 1G - SP1!

Posts: 1383


Total Thanks: 0
For This Post: 0



Trade: Not Specified

Re: DB
Reply #4 - Jul 7th, 2004, 4:48pm
 
adding a shower CU is not rocket science but you must work carefully and make the connections well

remember bad connections on a 50A cuircuit can be bad enough and this is 100A wiring so take care

this is a shower CU
http://www.screwfix.com/app/sfd/cat/pro.jsp?ts=05435&id=69659
...
(you can change the mcb to a 40A if suitable)

you will need to henly block it into the tails this is done as follows
fit a double pole henly block to the fuseboard
http://www.screwfix.com/app/sfd/cat/pro.jsp?ts=05950&id=14850
...
turn off the main switches on both the existing CU and the new CU

PULL THE SERVICE FUSE (TAKE CARE SOME OLDER SERVICE FUSE UNITS LEAVE AN EXPOSED LIVE WHEN YOU PULL THE FUSE)
remove the tails from the meter to the existing cu
use fresh 25mm red and black double insulated tails to rewire the cu's

connect meter to henly block
conenct henly block to main cu
connect henly block to shower cu

conenct the earth from the new CU to your main earth terminal
http://tlc-direct.co.uk/Products/TLEB8.html
...
useing 16mm earth cable if you do not have one install it between the main earth and the CU useing 16mm cable from the main eart to the main earth terminal and from the main earth terminal to the cu and move main equipotential bonds to it

put the service fuse back
turn back on main switches
Back to top
 
Thank User For This Post WWW plugwash plugwash 107767391 peter_m_green_zyworld_com plugwash  
IP Logged
 
LSpark
Global Moderator
Trade Member
Author
*****
Offline


Posts: 8069


Total Thanks: 3
For This Post: 0


London, UK, United Kingdom
London, UK
United Kingdom

Gender: male

Trade: Electrician



Re: DB
Reply #5 - Jul 7th, 2004, 5:00pm
 
jaja, I strongly recomend getting some advice on this from an electrician if you are not electricaly minded, it is not a minor job, you will need to properly assess maximum demand of each of them circuits, also having BS 3036 semi enclosed fuses will create problems.

I am presuming you have to have these electricaly heated system, electrical heating systems are very expensive to run, and waste alot of electricity, but if gas central heating system is not an option then ok.

If you can properly assess all that is needed then there is no problem, but I cannot recomended doing this yourself.


Back to top
 
Thank User For This Post View members image gallery  
IP Logged
 
Lectrician
Administrator
Trade Member
Author
*****
Offline

Ask The Trades
Posts: 8814


Total Thanks: 109
For This Post: 0


Braunton, North Devon, United Kingdom
Braunton, North Devon
United Kingdom

Gender: male

Trade: Electrician



Re: DB
Reply #6 - Jul 7th, 2004, 7:27pm
 
umm, 40amp supply and DIY=burnt out connection in no time Sad

I would use a 50amp breaker in a new one way board from the henly (or fit a new board), and then 16mm split concentric (yes you lot, i know!) to a new board adjacent to the heating system.

What is the 6kW heating, one of those electric boilers??  Ummm......go for LPG or Oil mate, lectric is sooo expensive as heating Smiley
Back to top
 

Need to post a picture? Click HERE for info!
Thank User For This Post WWW View members image gallery  
IP Logged
 
HM
Super Member
*****
Offline

Chief Turd Polisher
Posts: 5072


Total Thanks: 0
For This Post: 0


Gender: male

Re: DB
Reply #7 - Jul 7th, 2004, 7:38pm
 
[quote author=L.Spark  link=1089194736/0#5 date=1089216007]jaja, I strongly recomend getting some advice on this from an electrician if you are not electricaly minded, it is not a minor job, you will need to properly assess maximum demand of each of them circuits, also having BS 3036 semi enclosed fuses will create problems [/quote]
Can I reinforce what's being said here?

I was a pretty competent DIYer before last year, a qualified and experienced electronics engineer and all that, so what could some simple electrickery teach me? Hell, I knew red was live and black was neutral, and the funny green and yellow wire was earth - it don't get any more complicated than that does it? I thought I would get a tick in the box by acquiring my 2381 certificate (which I have). Hell, I was unemployed at the time and this was a tyre-kicking exercise that seemed like a good idea.

The one thing 2381 taught me above all else is that I'm not the dogs reproductive assets I thought I was. Previously I'd have been up for a full rewire and so on, but 2381 taught me no way, best left to the professionals. I really had no idea what TT, diversity and other terms meant for example.

These days, even though I could do many of the jobs myself and have done in the past, I'm very happy to pass on work to others who have been at the sharp end long enough to know how to do things properly. I'll do the occasional change of a broken 13A socket, install a loft light and replace a light fitting, but aside from that I consider it out of my domain.

Andrew
Back to top
 

If you aren't always sure of the right answer don't take up a career in the bomb squad
Thank User For This Post  
IP Logged
 
LSpark
Global Moderator
Trade Member
Author
*****
Offline


Posts: 8069


Total Thanks: 3
For This Post: 0


London, UK, United Kingdom
London, UK
United Kingdom

Gender: male

Trade: Electrician



Re: DB
Reply #8 - Jul 7th, 2004, 8:50pm
 
And id like to use that as a perfect example of Responsibility, it would not be responsible to carry out such works without due knowledge, and it's totally irresponsible to try and advise to do such things too.
There are some tasks which are minimal and present very low risk, this is not one of them!
Back to top
 
Thank User For This Post View members image gallery  
IP Logged
 
HM
Super Member
*****
Offline

Chief Turd Polisher
Posts: 5072


Total Thanks: 0
For This Post: 0


Gender: male

Re: DB
Reply #9 - Jul 7th, 2004, 10:01pm
 
[quote author=plugwash  link=1089194736/0#4 date=1089215330]adding a shower CU is not rocket science but you must work carefully and make the connections well [/quote]
Sorry about my blatant honesty which is known to take no friends, but I do feel this is out of the league of a DIYer because the end result could be a limp expired body lying on the shower floor.

This ain't a job I would take on - even in my own home, even though I believe I am more than competent to do the job.

Water and electricity don't mix, and especially if there is a moist body in the vicinity. I wouldn't want that moist body to be one of my family, or that of someone I know (Tony Bliar excepted).

So you do this super-duper wiring job. Great, wonderful, excellent news! Now what are you going to test it with to make sure it's safe? Everything is earthed right? Everything bonded equipotentially? The fault current is definitely gonna trip that connection if there's any stray current isn't it? Your RCD's are actually working within specification aren't they? You do have the 16th edition testing kit to hand and know how to use it?

There are too many variables in this situation for my liking.

Andrew
Back to top
 

If you aren't always sure of the right answer don't take up a career in the bomb squad
Thank User For This Post  
IP Logged
 
big_all
Global Moderator
Trade Member
Author
*****
Offline

heeelllooo
Posts: 5596


Total Thanks: 10
For This Post: 0


Gender: male

Trade: Joiner



Re: DB
Reply #10 - Jul 7th, 2004, 10:49pm
 
andrew you have my complete respect
you realised your shortfall and admitted it
it takes a brave man to admit any shortfall
and you have taught us all a good lesson there
Back to top
« Last Edit: Jul 7th, 2004, 10:49pm by big_all »  

big all ---------------  we are all still learning
Thank User For This Post View members image gallery  
IP Logged
 
HM
Super Member
*****
Offline

Chief Turd Polisher
Posts: 5072


Total Thanks: 0
For This Post: 0


Gender: male

Re: DB
Reply #11 - Jul 8th, 2004, 5:57am
 
Apologies, I discovered that soapbox mode got inadvertently switched on...... Wink

Andrew
Back to top
 

If you aren't always sure of the right answer don't take up a career in the bomb squad
Thank User For This Post  
IP Logged
 
Beanzy
Re: DB
Reply #12 - Jul 12th, 2004, 2:25am
 
Now then andrew we've caught you out here!

"Apologies, I discovered that soapbox mode got inadvertently switched on..."

Who wired the SoapBox?, was it a DIY job or did you get a pro in to do it? I hope it's got the correct IP (Indexfinger Pointing) rating and a RCD (Rant Ceaselessly Detector) if you're going to take it outside the main equipotential zone.

Wink

Good advice BTW.
Back to top
 
Thank User For This Post  
IP Logged
 
Page Index Toggle Pages: 1
Send Topic Print