well, had about 2 good days lol
worked 4 days on their conservatory sticking sockets on the outside walls with the cables and then plastered over, did the plumbing aswell, thing is, the conservatory isnt there yet lol, they started weekend just gone, siliconed bags over the sockets lol.
all the time i was doing that (plus some conduit runs on an outside wall) it was raining/ would start about 10am just after i blodey started
lol
and we had all the weather for a walk down the road(litraly 200 yards) onto porth beach
yeh, weather for gettin washed away!
ss