› Cavity wall insution and wall ties
(Moderator: TIMBA-WOLF) - (Moderator Group: Board Moderator)
<
Previous Topic
|
Next Topic
>
Pages: 1
Cavity wall insution and wall ties (Read 1664 times)
GODO64
GDPR opt-out
Cavity wall insution and wall ties
Jul 6
th
, 2014, 4:36pm
Hi
The cavity wall ties have been started at DPC level but should have been set 1 or 2 courses lower so the insulation can be installed at that level. Is it possible to correct this at this stage? The 3 course brick foundation wall up to DPC has not yet been built but the blockwork up to DPC and 5 courses above has. If it can't be changed what affect will it have?
Back to top
IP Logged
CWatters
Super Member
Offline
"Daddy fick it" says James
Posts: 5150
Total Thanks: 58
For This Post: 0
Gender:
Re: Cavity wall insution and wall ties
Reply #1 -
Jul 7
th
, 2014, 10:30pm
Sounds like you could cut a strip of insulation to fit below the bottom row of wall ties if the outer leaf hasn't been built yet. Fill gaps with expanding foam? or perhaps drill holes in the insulation and feed the ties through?
Back to top
IP Logged
Pages: 1
(Moderator: TIMBA-WOLF) - (Moderator Group: Board Moderator)
<
Previous Topic
|
Next Topic
>
Ask The Trades
›
DIY Forum
›
Building Questions
› Cavity wall insution and wall ties
Forum Jump »
Home
» 10 most recent Posts
» 10 most recent Topics
DIY Forum
- Electrical Questions
- Plumbing Questions
- Carpentry Questions
- Building Questions ««
- Painting, Decorating & Tiling Questions
- Alarms, Phones, Aerials, CCTV & Datacomms
Public Forum
- Just Talk
- Humour
- The Forum
- Trade Applications
Ask The Trades
» Powered by
YaBB 2.3
!
YaBB
© 2000-2008. All Rights Reserved.