Lectrician wrote on Aug 10th, 2009, 6:27am:I would simply go for two switch fused spurs.
Us metal clad ones, and join them to your metal clad socket with either a couple galvanised conduit couplers and brass bushes, or some short lengths of 20mm conduit.
I take that you are also recommending a method to run the cables between socket/fitting/switch here or have I misunderstood? I am able to run all the new cabling safely between joists and behind the plasterboarding - so probably don't need the conduit?
The single fused unit with 2-gang switch would be my preferred choice (only aesthetically) unless you think there's a safety issue to NOT do it this way? Is it OK to run them both through a 3 amp fused unit to the 2-gang switch?
Thanks to you both
H