Hi All,
Recently purchased my first house (currently waiting for it to all go through) bought as project.
Currently has a Heatre Sadia Sapphire electric shower circa 1988 installed which I'm not 100% happy with the installation of.
http://www.partsarena.co.uk/baxi/System/DATA/Dx/DS1/installation/3044/I48-3044/I...So far I've only been round the house twice and taken pictures, not been able to test anything etc.
The plan is a full rewire and probably a combi boiler (currently back boiler) in the new year - I'm just wanting to make sure in the interim that everything is as safe as possible, a family member nearly lost their house due to a similar shower installation and the circuit cable becoming the 'fuse'
Current setupThere is a metalclad Wylex Standard CU fitted with a mixture of MCB's and rewireable fuses. It looks like there has been work done in the past. The shower appears to be currently protected by a 30A rewireable fuse (based on labelling only), there is a 45A DP isolator mounted outside the bathroom. Wiring looks like it is 6mm (see CU picture)

Shower

My intial thoughts were that at the very minimum I should swap the rewireable for a Wylex plug in MCB. I was also under the impression that ideally the high rating circuits should be closet to the main switch.
Ideally the shower should be RCD protected as well
Should I bother with the MCB on a temporary basis or shall just junk the thing for the time being and get a combined bath tap/shower ?
Any thoughts chaps ?
(PS have spotted the tap shower attachment so know there is a good chance the shower is already Kaput)