screed floor - estimating quantities (Read 7351 times)
JohnD
GDPR opt-out
screed floor - estimating quantities
Aug 2
nd
, 2005, 12:25am
It occurs to me that rather than go back to my schoolboy maths (I failed the O level) someone might quickly and easily be able to work out the quantities of sand and cement I need for the screed floor I am about to lay.
The room is 11' by 5' 6" by 3 1/2 " deep. Any takers?
I make that about 335 by 168 by 8.89 cm, for those who think in metric. Don't rely on the conversion however - as I say, I failed maths!
Thanks - and thanks to Jerry for his help so far.
John D
Back to top
IP Logged
Dewy
GDPR opt-out
Re: screed floor - estimating quantities
Reply #1 -
Aug 2
nd
, 2005, 5:27pm
Dont quote me on it as the only mortar or concrete I have made had been for home use but I always ignored the volume of the cement as it is used to bond the aggregate (sand and gravel) together so I always worked on the volume of agregate.
Centimetres are only used in schools because they are the closest to an inch on rulers.
The SI (system international) measures are millimetre, metre and kilometre.
So your figures should be 3.35m, 1.68m & .889m (.9 is better)
Multiply the three together to get 5.065 cubic metres.
Back to top
IP Logged
JerryD
GDPR opt-out
Re: screed floor - estimating quantities
Reply #2 -
Aug 2
nd
, 2005, 6:11pm
Don't forget that a cubic metre of sand will not quite make a cubic metre of screed due to 'bulking' of sand when it is damp.
You may need as much as 5.5 - 6 cu/m of sharp sand to get 5 cu/m of screed.
Now the cement. A 25kg bag of cement will produce 0.06 cu/m of screed at 4:1 mix so for 5 cu/m you will need 83 bags.
Good luck!
btw, for volumes like this we always get Tilcon Ready mix screed. Screed is difficult and slow to mix in a conventional mixer. Ready mix screed has a retarder in it so you have all day to lay it. If you do decide to get Readymix screed you will need 5 cu/m as the bulking has been taken into account by the batching plant.
Back to top
«
Last Edit: Aug 2
nd
, 2005, 6:11pm by JerryD
»
IP Logged
woodsmith
Global Moderator
Trade Member
Author
Offline
Posts: 4395
Total Thanks: 135
For This Post: 0
Gender:
Trade: Joiner
Re: screed floor - estimating quantities
Reply #3 -
Aug 2
nd
, 2005, 6:23pm
JOHN STOPPPPPPPPPPPPPPPPPPPPPPPPPPP!!!!!
You need 0.5 cubic metres not 5 cubic metres
Hope you haven't order it for tomorrow
I hate metric so easy to get it wrong.
Back to top
IP Logged
JerryD
GDPR opt-out
Total Thanks: 135
For This Post: 0
Re: screed floor - estimating quantities
Reply #4 -
Aug 2
nd
, 2005, 6:32pm
Bloody 'ell Dewy. What a cock up
lol
Well spotted woody!
(btw, it's always best to over-order
slightly
................
)
Back to top
«
Last Edit: Aug 2
nd
, 2005, 6:34pm by JerryD
»
IP Logged
Dewy
GDPR opt-out
Total Thanks: 135
For This Post: 0
Re: screed floor - estimating quantities
Reply #5 -
Aug 2
nd
, 2005, 8:06pm
OOPS
I had the decimal point on the .889 one place out.
It should have been .09m
Geeze. I thought it sounded a lot.
I hate metric as well.
Back to top
«
Last Edit: Aug 5
th
, 2005, 1:23am by Dewy
»
IP Logged
trowelhead
GDPR opt-out
Total Thanks: 135
For This Post: 0
Re: screed floor - estimating quantities
Reply #6 -
Aug 3
rd
, 2005, 12:26am
Better to look at it than look for it!
Back to top
IP Logged
JohnD
GDPR opt-out
Total Thanks: 135
For This Post: 0
Re: screed floor - estimating quantities
Reply #7 -
Aug 3
rd
, 2005, 11:04am
Only 83 bags? Thought it would have been more......
Thanks to all who responded!!! Order - just of ten bags - made - and a ton of sand. We'll see how close this enables me to get!!!!
Thanks
JohnD
Back to top
IP Logged
JerryD
GDPR opt-out
Total Thanks: 135
For This Post: 0
Re: screed floor - estimating quantities
Reply #8 -
Aug 3
rd
, 2005, 7:37pm
If there's any left over I've got Dewy's address
btw, just divide everything I said by 10
Erm.... 8.3 bags, ok get 10 then
lol
Back to top
IP Logged
Dewy
GDPR opt-out
Total Thanks: 135
For This Post: 0
Re: screed floor - estimating quantities
Reply #9 -
Aug 3
rd
, 2005, 8:23pm
[quote author=JerryD link=1122938731/0#8 date=1123094234]If there's any left over I've got Dewy's address
lol [/quote]
I think I had better move to a new address.
Back to top
IP Logged
JohnD
GDPR opt-out
Total Thanks: 135
For This Post: 0
Re: screed floor - estimating quantities
Reply #10 -
Aug 5
th
, 2005, 1:02am
Seven sacks of cement did it - and there was some sand left over too - the floor sloped more than I realised! Result was not absolutely perfect but quite good enough!
Thanks to all who gave advice.
JohnD
Back to top
IP Logged
Dewy
GDPR opt-out
Total Thanks: 135
For This Post: 0
Re: screed floor - estimating quantities
Reply #11 -
Aug 5
th
, 2005, 1:27am
Just as well woodsmith noticed my 'slight' mistake or you would have bought 70 sacks of cement John. lmao
Back to top
IP Logged
Pages: 1
(Moderator: TIMBA-WOLF) - (Moderator Group: Board Moderator)
<
Previous Topic
|
Next Topic
>
Ask The Trades
›
DIY Forum
›
Building Questions
› screed floor - estimating quantities
Forum Jump »
Home
» 10 most recent Posts
» 10 most recent Topics
DIY Forum
- Electrical Questions
- Plumbing Questions
- Carpentry Questions
- Building Questions ««
- Painting, Decorating & Tiling Questions
- Alarms, Phones, Aerials, CCTV & Datacomms
Public Forum
- Just Talk
- Humour
- The Forum
- Trade Applications
Ask The Trades
» Powered by
YaBB 2.3
!
YaBB
© 2000-2008. All Rights Reserved.